AFCU Skid Monfalcone

The Monfalcone CCGT project aimed to transform the historic coal-fired power station in Monfalcone into a modern, high-efficiency natural gas combined cycle power plant (CCGT), designed to use green hydrogen.

The project is part of the national energy system’s decarbonisation strategy.

Site: A2A power station in Monfalcone

Location: Monfalcone (Italy)

Final customer: Siemens Energy

Year: 2023

Combined Cycle Gas Turbine: 880 MW

What we have worked on

Monteco took part in this project by undertaking the detailed design of the process system on a complete skid on behalf of the AFCU (Ammonia Flow Control Unit) supplier. This skid is configured for on-site transport without the need for dismantling or reassembly.

The supply included:

  • Complete engineering services for construction
  • Mechanical calculations including : Foundation loads, Calculation of lifting loads, Calculation of the evaporator tank, PED Declaration for piping. Piping stress analysis on the high-temperature line (+400°C)
  • Electrical engineering design
  • Piping supply and mechanical fabrication
  • Cabling
  • FAT and packaging for shipping