The Monfalcone CCGT project aimed to transform the historic coal-fired power station in Monfalcone into a modern, high-efficiency natural gas combined cycle power plant (CCGT), designed to use green hydrogen.
The project is part of the national energy system’s decarbonisation strategy.
Site: A2A power station in Monfalcone
Location: Monfalcone (Italy)
Final customer: Siemens Energy
Year: 2023
Combined Cycle Gas Turbine: 880 MW

What we have worked on
Monteco took part in this project by undertaking the detailed design of the process system on a complete skid on behalf of the AFCU (Ammonia Flow Control Unit) supplier. This skid is configured for on-site transport without the need for dismantling or reassembly.
The supply included: