— References
Ignition Skid – Flare system
The Boysun Gas Processing Plant (BGPP) is one of the largest energy projects currently underway in the Surkhandarya region, in southern Uzbekistan. It forms part of the development of the large “Mustaqillikning 25 yilligi” gas field located near the town of Boysun.
As part of the gas gathering system for the fields, a connection to a flare plant is planned at each cluster pad and each single well pad.
The flare system is intended for the discharge and subsequent combustion of flammable gases and vapours in the event of manual bleeding, the automatic activation of safety devices, or emergency release.
Site: Mustaqillikning 25 yilligi
Location: Boysun District (Uzbekistan)
Final customer: Surhan Gas Chemical Operating Company
General contractor EPC: Enter Engineering
Year: 2023


What we worked on
Monteco took part in this project by supplying a batch of ‘ignition skids’ on behalf of the flare system contractor.
In particular, these skids were equipped with heating trays, sensors and backup fuel gas cylinders, to be used in the case of an emergency, fitted with a balance to monitor the residual gas in the cylinders.